Earned Value Management Example

NPV Stock Analyzer Views

Totals

Introduction
This tool generates a variety of basic net present value stock statistics for DevTreks capital budgets and operating budgets.

Calculation View Description
v171a

Version: 1.7.0

Feedback About commercial/investmentgroup/Earned Value Management Example/275505678/none

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Descendants?
Overwrite Descendants?
Compare Using:
Aggregate Using:
Display Full View:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Method 2. Do you wish to save the analysis as comma-separated, column-row, text? This format is amenable to further analysis in standard statistical packages. The text can be downloaded by packaging and downloading this uri.



Instructions (beta)

Step 1

  • Step 1. Base Calculations To Analyze: Make sure the data being analyzed corresponds to either operating budgets or capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
DevTreks -social budgeting that improves lives and livelihoods
Investment Group : Earned Value Management Example EVM01 11/07/2013
Benefits
Output Name Unit Price Amount Compos Unit Compos Amount Total Benefit Total Incentive
2013 RR Track Site Prep mile 7,000,000.00 14.00 each 14.00 5,066,524.20 5,066,524.20
Costs and Nets
Total OC Total AOH Total CAP Total Cost Net Returns Total Incent Net Incent Returns
2,734,874.37 911,624.79 2,430,999.44 6,077,498.61 -1,010,974.41 6,077,498.61 -1,010,974.41
Investment : 01 RR Track, Planned RR01 09/19/2014
Benefits
Output Name Unit Price Amount Compos Unit Compos Amount Total Benefit Total Incentive
2013 RR Track Site Prep mile 4,000,000.00 8.00 each 8.00 4,053,455.07 4,053,455.07
Costs and Nets
Total OC Total AOH Total CAP Total Cost Net Returns Total Incent Net Incent Returns
1,820,099.23 606,699.74 1,617,865.98 4,044,664.96 8,790.11 4,044,664.96 8,790.11
Time Period : 2013, Time Period 01, Planned 2013 12/31/2013
Investment : 02 RR Track, Actual RR01 09/19/2014
Benefits
Output Name Unit Price Amount Compos Unit Compos Amount Total Benefit Total Incentive
2013 RR Track Site Prep mile 3,000,000.00 6.00 each 6.00 1,013,069.13 1,013,069.13
Costs and Nets
Total OC Total AOH Total CAP Total Cost Net Returns Total Incent Net Incent Returns
914,775.14 304,925.05 813,133.46 2,032,833.65 -1,019,764.52 2,032,833.65 -1,019,764.52
Time Period : 2013 Time Period 01, Actual 2013 12/31/2013
Dataset: Earned Value Management Example IRI This building construction benefit and cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress capital budget analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.